How do I maintain the wholesale j2rail fastening system during use?

wholesale j2rail fastening system https://www.hbrailwayfastening.com/KPO-Clamp-Rail-Fastening-System

As we all know, the wholesale j2rail fastening system needs to do a good job in the direction of the straight basic rail and set its position. The gauge and lead curve deviation on the wholesale j2rail fastening system are based on the straight base rail, so the direction of the straight base rail should be set first when repairing the wholesale j2rail fastening system. When adjusting the direction of the wholesale j2rail fastening system located in the middle of the wholesale j2rail fastening system group, if the left and right tandem movement involves a large range, it should be measured in advance. Position the wholesale j2rail fastening system group before adjusting the wholesale j2rail fastening system.

As we all know, the wholesale j2rail fastening system needs to do a good job in the direction of the straight basic rail and set its position. The gauge and lead curve deviation on the wholesale j2rail fastening system are based on the straight base rail, so the direction of the straight base rail should be set first when repairing the wholesale j2rail fastening system. When adjusting the direction of the wholesale j2rail fastening system located in the middle of the wholesale j2rail fastening system group, if the left and right tandem movement involves a large range, it should be measured in advance. Position the wholesale j2rail fastening system group before adjusting the wholesale j2rail fastening system.

Do a good job of the overall maintenance and maintenance of about 50m lines before and after the wholesale j2rail fastening system, keep the rail plane flat without debris, in the wholesale j2rail fastening system disease prevention, we should first do the direction before and after the line, Adjust the direction of the wholesale j2rail fastening system.

Strengthening the tamping operation, in addition to the tamping in accordance with the ordinary track manual tamping procedures, the wholesale j2rail fastening system structural features are appropriately strengthened is also a good choice. For ballast beds, smaller ballast sizes are recommended. The tamping pick should be 150 mm longer than the ordinary tamping pick. In addition, the number of picks should be appropriately adjusted and increased according to the width of the distance between the turnout pillows and the stress of each part to strive for balanced quality.

Strengthen the maintenance of parts and give full play to the role of various fasteners in fixing the rail position. Eliminate nonconforming spikes and use spikes of sufficient length for switches, crossings, and guardrails. Timely replacement, replacement and repair of parts to eliminate three joints and prevent horizontal movement of the basic rail.

wholesale j2rail fastening system https://www.hbrailwayfastening.com/KPO-Clamp-Rail-Fastening-System


yousladecom

11 Blog posts

Comments